Negative-Pressure Leak Testing
Naike Creative is the group’s B2B team for distinctive plastic drinkware, creative food containers and related custom programs for brands, importers, distributors and venue operators.
Based in Jinjiang, the team coordinates product selection, sampling, tooling, decoration, packaging, inspection and export details against the approved project brief.
About our companyMove from buyer objective to the product family, approval evidence and delivery route that fit the project.
START WITH THE PRODUCT
Compare the product format first, then confirm material, capacity, decoration and packing for the destination market.
Existing formats · MOQ from 500 pcs · Samples in 3–7 days
Start with an existing format, then confirm color, artwork, compatible lid or accessory options and packaging for the intended market.

New tooling · Typical tooling time 7–15 days · Confidential project review
Develop a new shape from a drawing, reference sample or initial concept. Geometry, ownership terms, tooling scope, sample approval and production specification are confirmed for each project.







The typical starting MOQ is 500 pieces. The final MOQ depends on product format, material, decoration, packaging and whether new tooling is required.
Samples normally take 3–7 days after the specification and artwork are confirmed. New tooling normally takes 7–15 days before the first tool trial; final timing depends on geometry and approval scope.
Available options can include color, artwork, compatible lids or accessories and packaging. The exact options are confirmed against the selected product before quotation.
The required test scope is confirmed for the exact product, material, intended use and destination market. Available reports should be reviewed for product identity, test standard, laboratory and date.
Company name, work email and product of interest are enough to begin. Quantity, country, artwork, packaging and target delivery date can be added when available.

Compare heat tolerance (-20°C to 100°C), crystal clarity, impact durability, and raw material cost factors across drinkware lines.
READ MORE →
Key chemical migration limits, BPA-free lab verification, and regulatory test documentation to avoid customs seizure and retail audit delays.
READ MORE →
Detailed analysis of mold steel grades (S136/NAK80), cavity configurations, 7–15 day mold schedules, and amortized piece-price savings.
READ MORE →
Reverse-engineered schedule from 3–7 day sampling and mass molding to export palletization and international ocean transit.
READ MORE →